Attached is the cost estimate to move the computer cluster at this time to N-206 and N-207 (subdivided). This includes the wall, doorways (replacing the cheapo wooden frame door between the two rooms now), moving the mechanical and electrical for the project, cutting down the benches to a usable height, paint and lights. The work can be accomplished by mid-January so the computers can be placed there when they arrive on campus, assuming the shelves in N-207 can be removed next week. Let me know if you would like to proceed, and when the shelves in N-207 can be removed so construction can start. As always, call with questions. George Ext 8604
Attachment:
PhysicsComputerMoveRev1.xls
Description: MS-Excel spreadsheet