Sorry I didn't get back to you sooner, but I was out of town last week
and the
you-know-what's hit the fan since I got back.
When do you want to get together to review the proposal(s)? I can do
it tomorrow
(Thursday) morning or MWF morning of next week.
Mike
"Souleret, George" wrote:
I would like to review the proposal(s) given you regarding the UPS system
for the computer racks. My preference is that a 3 phase UPS be used to
better balance the loads on our transformers and panels. I have a UPS
proposal with approximately 30 minutes of battery backup if your vendor has
trouble with this. (Approximately $26,250)I have estimated the air-conditioning and power needs based on the rough
estimates of heat loads and power usages you gave me. The A/C will be for
only the two rooms (servers and personnel) and has the condenser on the
roof. These are very rough for now but should be good budgets: $21,000.00
for A/C and 3 phase subfeed panel and wiring in UPS (provided separately),
plus roof penetration.As you get closer to a decision, I would like to review the specification
sheets to confirm previous loads.
-- Michael F. Vineyard Phone: (804) 289-8257 Department of Physics Fax: (804) 289-8482 University of Richmond, VA 23173 E-mail: mvineyar@richmond.edu Web: www.richmond.edu/~mvineyar