Infrastructure Support for the Computer Upgrade
I would like to review the proposal(s) given you regarding the UPS system
for the computer racks. My preference is that a 3 phase UPS be used to
better balance the loads on our transformers and panels. I have a UPS
proposal with approximately 30 minutes of battery backup if your vendor has
trouble with this. (Approximately $26,250)
I have estimated the air-conditioning and power needs based on the rough
estimates of heat loads and power usages you gave me. The A/C will be for
only the two rooms (servers and personnel) and has the condenser on the
roof. These are very rough for now but should be good budgets: $21,000.00
for A/C and 3 phase subfeed panel and wiring in UPS (provided separately),
plus roof penetration.
As you get closer to a decision, I would like to review the specification
sheets to confirm previous loads.